Client:
well-known brand manufacturer of baby, home, healthcare and industrial products
> 500 employees
Industry:
Manufacturer of branded goods
Topic:
PDM system introduction, document management, ROI/cost/benefit analysis, DMS and/or PDM selection, PDM selection, benchmark
Situation:
The company planned a preliminary specification and selection phase and the actual introduction of a central MultiCAD-capable DMS, PDM and project management (PM) system with the following objectives, among others:
- Support for both product/sales item development and design as well as equipment design/engineering
- Support of a MultiCAD connection (SIEMENS NX or I-DEAS, SolidWorks, SolidCAM) as well as a smooth SAP connection (approx. 250 users)
- Replacement of the sometimes risky, error-prone and redundant way of working with project folders
- Medium-term replacement of the non-integrated e-mail system
- Flexible connection and supply of distributed locations as well as controlled connection of the respective local engineering offices and partners on site
- Bundling of all product and project-related data in a central system, including a standardized approval and change management system