Client:
Manufacturer of plants for concrete block production
> 300 employees
Sector:
Mechanical and plant engineering for the building materials industry
Topic:
Quotation configuration, parts list system, product construction kit, classification, customization design, change management
Situation:
The average age in the mechanical design department was around 50 years, in the electrical department around 40 years. The structures in the design area had grown. Manufacturing cost reduction measures in the past were successful, but the optimization of workflows and processes was not to the same extent. Even with declining order backlogs, capacity utilization in the design department remained high. Optimization efforts under our own steam were without lasting success.